您好,欢迎访问济南庆飞机械设备有限公司官网 网站

全国咨询热线:

15621892888
15550061228

当前位置:首页>新闻资讯>行业动态固定式液压登车桥安装坑位要预留多大?

固定式液压登车桥安装坑位要预留多大?

文章出处:http://www.qingfeijixie.cn/ 人气: 0 发表时间:2023-01-11
在现在的仓储设备中,固定式液压登车桥一直发挥着很大的作用,给人们的装卸货提供了非常大的便利性,然后,它需要安装在固定作业场合的货台上面,比移动式液压登车桥多了一个安装的过程,那关于固定式液压登车桥安装坑位要预留多大?今天上海牛力机械就给大家介绍一下:
In the current storage equipment, the fixed hydraulic boarding bridge has always played a great role, providing great convenience for people to load and unload goods. Then, it needs to be installed on the cargo platform in the fixed working place, which is one more installation process than the mobile hydraulic boarding bridge. So how much should be reserved for the installation pit of the fixed hydraulic boarding bridge? Today, Shanghai Niuli Machinery will introduce to you:
固定式液压登车桥安装坑位要预留多大?
How large should the installation pit of fixed hydraulic boarding bridge be reserved?
由于固定式液压登车桥有需要定做和不需要定做两种形式,很多固定场合都是不需要定制的,上海牛力机械家常规款登车桥的尺寸是:2440*1830mm,需要预留的坑位是2600*1860*510mm,只要按照厂家这种标准型尺寸预留就可以了,然而,有的作业场合、环境不同,需要重新根据现场要求进行定制才行,这个时候就需要厂家技术人员现场勘察,然后设计登车桥图纸,才能确定预留的坑位大小。
Because there are two forms of fixed hydraulic boarding bridge that need to be customized and not need to be customized, many fixed occasions do not need to be customized. The size of the regular boarding bridge of Shanghai Niuli Machinery Co., Ltd. is 2440 * 1830 mm, and the pit to be reserved is 2600 * 1860 * 510mm. As long as it is reserved according to the standard size of the manufacturer, it can be done. However, some operating occasions and environments are different, and it needs to be customized according to the site requirements again, At this time, the manufacturer's technicians need to conduct on-site survey and then design the boarding bridge drawings to determine the size of the reserved pit.

固定式液压登车桥
Fixed hydraulic boarding bridge
上海牛力机械固定式液压登车桥
Shanghai Niuli Mechanical Fixed Hydraulic Boarding Bridge
固定式液压登车桥简单的安装过程!
Simple installation process of fixed hydraulic boarding bridge!
一、根据登车桥尺寸,先挖好一个地坑,无地坑是无法安装的;
1、 According to the size of the boarding bridge, dig a pit first. No pit can be installed;
二、把地坑内走线的线路预留好,在地坑尾部的中心地方;
2、 Reserve the wiring in the pit at the center of the pit tail;
三、地坑内的三角边都需要用钢来包边,把用于固定的锚钉焊接与角钢的内面,然后上面铺一些沙子,再用混凝土铺设一下;
3、 The triangular edges in the pit need to be wrapped with steel. The anchor nails used for fixing are welded to the inner surface of the angle steel, and then some sand is paved on it, and then concrete is paved;
四、将防撞胶块固定于货台前端登车桥两侧;
4、 Fix the anti-collision rubber block on both sides of the boarding bridge at the front of the cargo platform;
五、检查下各个部位是否固定牢固,施工完毕。
5、 Check whether each part is fixed firmly and the construction is completed.
以上就是为大家介绍的有关移动登车桥详细的介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以的态度,为您提供服务http://www.qingfeijixie.cn
The above is the detailed introduction about the mobile boarding bridge for you, and I hope it can help you. If you have any questions, please contact us. We will provide you with our service with our attitude http://www.qingfeijixie.cn