固定式登车桥安装坑位要预留多大?

文章出处:http://www.qingfeijixie.cn/ 人气: 0 发表时间:2022-05-18
一直发挥着很大的作用,给人们的装卸货提供了非常大的便利性,然后,它需要安装在固定作业场合的货台上面,比移动式液压登车桥多了一个安装的过程,那关于固定式液压登车桥安装坑位要预留多大?
It has been playing a great role in providing great convenience for people's loading and unloading. Then, it needs to be installed on the cargo platform in fixed operation occasions, which has an installation process more than that of mobile hydraulic boarding bridge. How large should the installation pit of fixed hydraulic boarding bridge be reserved?
由于固定式登车桥有需要定做和不需要定做两种形式,很多固定场合都是不需要定制的,如果登车桥的尺寸是:2440*1830mm,需要预留的坑位是2600*1860*510mm,只要按照厂家这种标准型尺寸预留就可以了,然而,有的作业场合、环境不同,需要重新根据现场要求进行定制才行,这个时候就需要厂家技术人员现场勘察,然后设计登车桥图纸,才能确定预留的坑位大小。
Because the fixed boarding bridge has two forms that need to be customized and do not need to be customized, many fixed occasions do not need to be customized. If the size of the boarding bridge is 2440 * 1830mm and the pit position to be reserved is 2600 * 1860 * 510mm, it can only be reserved according to the standard size of the manufacturer. However, some operation occasions and environments are different and need to be customized according to the on-site requirements, At this time, the manufacturer's technicians need to conduct on-site investigation, and then design the boarding bridge drawing, so as to determine the size of the reserved pit.
1、根据登车桥尺寸,先挖好一个地坑,无地坑是无法安装的;
1. According to the size of the boarding bridge, dig a pit first. It cannot be installed without a pit;
2、把地坑内走线的线路预留好,在地坑尾部的地方;
2. Reserve the routing line in the pit and place it at the end of the pit;
3、地坑内的三角边都需要用钢来包边,把用于固定的锚钉焊接与角钢的内面,然后上面铺一些沙子,再用混凝土铺设一下;
3. The triangular edges in the pit need to be covered with steel. Weld the anchor nails used for fixing with the inner surface of the angle steel, and then lay some sand on it, and then lay it with concrete;
4、将防撞胶块固定于货台前端登车桥两侧;
4. Fix the anti-collision rubber block on both sides of the boarding bridge at the front end of the cargo platform;
5、检查下各个部位是否固定牢固,施工完毕。
5. Check whether all parts are fixed firmly and the construction is completed.
本文的精彩内容由移动登车桥提供知识提供,本网站还有很多的精彩内容,更多的内容您可以点击进入:www.qingfeijixie.cn我们有专门的客服为您解答问题
The wonderful content of this article is provided by the mobile boarding bridge. There are many wonderful contents on this website. You can click to enter: www.qingfeijixie.com Cn we have special customer service to answer your questions